This makes one of the “solutions” from the article: “A law was introduced at the end of 2023 that will eliminate the need for permits and environmental impact assessments for bridges that are being widened to add lanes as part of renovations.” look particularly shortsighted. Infrastructure is a maintenance debt that we are reckoning with, so we will make it easier to build specifically bigger infrastructure so that in 25 years we will have an even bigger problem to solve? Not to mention the concept of induced demand meaning that those lanes are going to increase the amount of vehicles using the bridge, which would be exactly the kind of thing that should get an environmental assessment, versus repurposing some lanes for sustainable transit or building a separate bridge for those modes
Pretty sure they said what they want in the second half of the sentence. Slow the product release cycle to match the pace of technological progress. Hard to imagine it happening in a market-driven world, but a slower release cycle would incentivize more affordable, longer supported products without having to change anything about physics